Ascent Logistics Park Warehouse

Project Overview

We were appointed to undertake the full electrical installation for a new warehouse and distribution centre at Ascent Logistics Park, Bedfordshire. The site forms part of a multi-phase commercial development designed to support national logistics operations. Works covered high-capacity warehouse areas, fitted office accommodation, and external access zones, delivering a complete and future-proof electrical infrastructure.

Objectives

  • Provide a full electrical system to support warehousing, logistics, and office operations.
  • Deliver reliable lighting, power distribution, and life-safety systems for a high-performance industrial environment.
  • Ensure compliance with electrical standards and health & safety regulations.
  • Complete works within a fast-tracked programme and client handover schedule

Scope of Works

Power & LV Distribution

  • Installation of main LV panel board and sub-main cabling to warehouse distribution boards, plant areas, and offices.
  • Final circuits for loading bays, roller shutters, conveyors, and office equipment.
  • High-level three-phase outlets for automation systems and M&E plant.

Lighting & Emergency Lighting

  • High-efficiency LED linear fittings with PIR control for warehouse areas, compliant with lux level requirements.
  • LED panel lighting in offices with presence detection and manual override.
  • Emergency lighting to BS 5266 standards, tested and certified.

Life Safety & Security

  • Addressable fire alarm system with detectors, manual call points, and sound/visual devices.
  • Infrastructure for CCTV and access control at staff entrances and loading bays.
  • Provision for future intruder alarm integration.

Project Challenges

The project was delivered against aggressive timescales, requiring us to phase works carefully, maintain close coordination with other trades, and accelerate commissioning to meet the fast-track programme. At the same time, the electrical design needed to provide flexibility for future tenant fit outs, with spare capacity and adaptable containment included to accommodate expansion or upgrades.

Another challenge involved the integration and sequencing of electrical feeds with mechanical systems, including HVAC, roller shutters, and dock levellers, ensuring seamless operation across the warehouse and office facilities.

OUTCOME

JH Electrical Services successfully delivered the full electrical package at Ascent Logistics Park on time, within budget, and to a high standard. The facility now benefits from a modern, efficient, and adaptable electrical system designed to support continuous large- scale logistics operations.